Homepage | Set Home | Add to Favorites
Member

EQ Metal Co.,Limited


Products
  • No Category
Search
 

Friends links
  • No link

Outdoor Metal Stainless Steel Junction box
Click image to view full size image
Product: Views:366Outdoor Metal Stainless Steel Junction box 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-12 14:25
  Inquiry
Details

 

1.Description of High Quality Outdoor Metal Stainless Steel Junction Box 

 

Stainless steel enclosures
Material: Enclosure and door manufactured from AISI 304 sheet steel ( AISI 316L on request.)

 

- Flat mounting plate manufactured from galvanised sheet steel.
- Hinges in stainless steel
- Thickness of sheet steel: Enclosure & door 1.2mm till size STX6 820, then 1.5mm
- Thickness of mounting plate: Zinc coated steel 1.5mm till size STX6 820, then 2.0mm

 

Supply include: Enclosure body, door with lock & galvanised mounting plate, seal gasket and fixing accessories. Wall mount brackets 4pcs/set to be offered separately.

 

- Protection degree: IP 66 to EN60 529 NEMA 4
- Impact resistance IK10

2.Exploded view of High Quality Outdoor Metal Stainless Steel Junction Box


FAQ

Q1. When can I get the price for the electric  meter box?

We usually quote within 24 hours after we get your inquiry. If you are very urgent, pls call us or tell us in your email so that we will regard your inquiry priority.

Q2. How can I get a sample to check your quality?

After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value under USD15), as long as you afford the express freight.

Q3.How long can I expect to get the sample?

After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 3-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.

Q4.What about the leading time for mass production?

Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.


Inquiry